Sludge dewatering at Municipal WWTP
Effective solutions for sludge dewatering , from design to implementation, including constructing the facilities in the sewage treatment plants.
Effective solutions for sludge dewatering , from design to implementation, including constructing the facilities in the sewage treatment plants.
Reflection cracking geogrid - The application of an interlayer between two asphalt layers can retards reflective cracking between asphalt layers.
Draining underground structures is an integral part of the lining systems.
Geocell Cellular Confinement System (Geocells), employing cells of varying size, texture and height, arrests erosion by confining soil in relatively small cells.
Controlling water flow in streams, channels and similar locations is essential for protecting infrastructure and the environment. By using gabions and mattresses in locations such as dams and waterfalls, riverbanks and canals, the soil is stabilized.
Fast construction of high embankments over soft soil requires high strength geotextiles at the base for stability against slip failure
The "geosynthetic-reinforced soil on piles" foundation system is virtually settlement-free and thus ideal for rapid embankment construction.
Consolidation can be accelerated by installing vertical drains to a depth of up to 35 meters, shortening its settlement rate from several years to several months.
Concrete reinforcement by adding steel fibers to sprayed concrete in tunnels precludes the need to use expensive molds and complex castings, thus allowing saving of expensive resources.
Polymer PP fibers for concrete for Industrial flooring, Prefabricated elements in tunnels and Cracks reduction.